Project List

South Eastern Railway

RSI Analysis at Br No. 187 (2x12.2 M CG) in BLDA-DNT & 03 bridges in SFO-RVNL at Br. No. 332 (7x12.2M CG), Br. No. 336 (6x12.2M CG) & Br. No. 338 (4x12.2M CG) for construction 3rd Line between Narayangarh - Bhadrak.

Completed

Western Railway

Detailed structural design and drawings for substructure and foundation of Important Bridge No. 813 Narmada Bridge between BWW-OM section of RTM division.

Completed

North Central Railway

Rail Structure Interaction (RSI) Analysis of composite Girder Bridges of Jhansi Division (4 Nos).

Completed

Western Railway

Design & Drawings of retrofitting scheme for distressed substructure and foundation of bridge No. 374 (15x30.5m) of Udhna-Jalgaon section of Mumbai Division.

Completed

Western Railway

Design & Drawings of retrofitting scheme for distressed substructure and foundation of bridge No. 130 (11x30.5m) of DB CTD Section of BRC Division.

Completed

IIT, Guwahati

Instrumentation of superstructure using strain gauges, displacement transducers, and accelerometers of various spans between Garhwa Road and SoneNagar of East Central Railway.

Completed

Central Railway

RSI analysis of composite Girder Bridge 293/1 (7x18.3m) in Nandgaon-Pimparkhed section in connection with Manmad-Jalgaon 3rd line Project.

Completed

Western Railway

Load testing and instrumentation of U type PSC girder of 18.3m span of Major Bridge No. 437 between BRLA-NLI section in connection with doubling project of NMH-RTM section in Ratlam Division.

Completed

NHAI Patna

Design of retrofitting scheme of the superstructure of ROB @ 177+182 and Major bridge over Gandak @ 206+436 of 4 laning of Chhapra-Hajipur section on NH-19.

Completed

NHAI Ranchi

Design of Strengthening scheme of continuous PSC Girders (80m) by CFRP of Telmacho Bridge under Govindpur (Rajganj)-Chas-WB Border section of NH-32, Jharkhand.

Completed

H. G. Infra Engineering Ltd

Adequacy check for existing Arch bridge No. 373/2, 373/3 & 374/1 of Central Railway.

Completed

Sri Durge Condev Pvt Ltd

Detailed design and drawings of Railway Bridges, ROBs, RUBs and other structures between Srirampur and Pallahra Road stations of Talcher-Bimalagarh New BG Rail link project of ECOR.

Completed

South Eastern Railway

Rail structure interaction (RSI) analysis for bridge Nos. 199–206 of Narayangarh-Bhadrak section (construction of 3rd line) of Kharagpur division.

Completed

MRVC Mumbai

Rail Structure interaction (RSI) analysis of bridge No. 73 and 75 located between Bhayandar and Naigaon Stations of Mumbai Division.

Completed

Western Railway

Investigation of strength of existing substructure of bridge No. 624 UP (8x64m) of Vadodara Division.

Completed

Central Railway

Design and drawing for Major Bridge No. 1031/2 (ROR), Major Bridge No. 833/1, RUB Br. 1041/3, RSI analysis of Br. No. 833/1 in connection with Itarsi-Nagpur 3rd Line.

Completed

RVNL Nagpur

Design of Major Bridges/ Minor Bridges/ ROBs/ RUBs/ Aqueduct, etc. from km 190 to km 207 in YTL-NED Project.

Completed

RITES Limited, Mumbai

Instrumentation for RSI analysis of track bridges No. 428 (Span: 2x18.30m) Section Virar-Surat.

Completed

Central Railway

Design and Drawing of important Bridge No. 836.1, 7/30.5m Composite Girder in connection with Itarsi-Nagpur 3rd & 4th line.

Completed

Western Railway

Instrumentation and continuous monitoring of pier P5 to P9 of bridge no. 130 (11x30.5m) of Dabhoi-Alirajpur section of Vadodara Division.

In Progress

Western Railway

Instrumentation and continuous monitoring of pier P8 to P11 of bridge no. 374 (15x30.5m) of Udhna-Jalgaon section of Western Railway.

Completed

Eastern Central Railway

Consultancy work on Rehabilitation of ROB BEA (Bow String Girder) between stations KRS-BEA in PNBE-DDU section of Danapur Division.

Completed

NHAI Patna

Preparation of DPR for blackspots on NH-19 of Chhapra-Hajipur Section.

Completed

East Central Railway

Checking adequacy and designing strengthening scheme of the welded bow sting girder of ROB at Bhabua Road station limit and Kudra station of DDU Division.

Completed

East Coast Railway

Rail Structure Interaction Analysis of bridge No.92 of Jarpada Budhapank 3rd & 4th lines.

Completed

ISC Projects Pvt Ltd

Design of Launching scheme of Bridge No. 627/1 (4x76.2m) OWG between Amalakhurd and Tukaithad Stations of Nanded Division of SCR.

Completed

Central Railway

Design of an important Bridge No. 835/2 (9x30.5m) Composite girder in connection with Itarsi – Nagpur 3rd & 4th line.

In Progress

Western Railway

Rail Structure Interaction (RSI) analysis and providing suitable modification / strengthening for continuation of LWR for Important Bridge No. 85 (15x18.30m) composite girder of HMT-KDBM Section.

Completed

Northern Railway

Rail–Structure Interaction Analysis of Railway Bridge No. 75 (14 × 30.5m) Composite Girder in Jaunpur–Zafarabad Section of Lucknow Division.

Completed

RVNL Ranchi

Instrumentation of Bridge No. 210, 231, 240 and 278 of Dhanbad Division of East Central Railway.

Completed

South Eastern Railway

Design of 36m Non standard Bow String Girder for SUV loading and congestion factor for ROB 91/A Between Jharsuguda and Sardega.

Completed

ISC Projects Pvt Ltd

RSI Analysis of Talwara Viaduct (Approximately- 4km length) of Northern Railway.

In Progress

RITES Limited, Mumbai

Instrumentation for RSI analysis of track bridges No. 405 (Span: 4x18.30m) Udhna-Jalgaon section of Western Railway.

In Progress

Western Railway

Instrumentation and load testing of Arch Bridge No. 87 of Ujjain-Bhopal section of Ratlam Division.

Completed

Rights Construction Pune

Preparation of GAD and structural design of bridges and structures of EPC work of 4.6 km and 21.7 Km section of Amlakhurd-Akot section of SCR.

In Progress

RITES Limited, Gurugram

Instrumentation for RSI analysis of track bridges No. 6 (Span: 2x24.2m) and 6A (3x30.5m) near Arariya of NFR.

In Progress

RITES Limited Gurugram

Instrumentation and structural assessment of Teesta river bridge No. 40 (20x47.5m) OWG Near Jalpaiguri of NFR.

In Progress

NHAI Begusarai

Structural assessment of Hathidah ROB of BSG of 76m span.

In Progress

NHAI Hazaribagh

Review of Structural design of ROB at Ch 281 of NH-2 in Jharkhand of Kodarma-Hazaribagh section.

In Progress

NHAI Hazaribagh

Analysis of PSC segmental BOX girder superstructure of flyover near Chauparan for six laning project of NH-2 from Km 249.525 -320.810 in the state of Jharkhand.

In Progress

Western Railway

Design of bridge No. 101 of Laxminagar-Indore section of Ratlam Division.

In Progress

KCC Buildcon Pvt. Ltd

Preparation of L section, ESP, GAD and structural design of bridges and structures of EPC work of 39 Km doubling work of Sitamarhi-Raxaul section of Samastipur Division of ECR.

In Progress
Show all projects